225L Button type Constant High Temperature Aging Testing Chamber/Oven/ Drying Oven /Hot Air Circulation Oven/Test Chamber
Button-Type High-Temperature Test Chamber
Product Design Specification (PDS)
Purpose
The high-temperature testing machine is used for drying, baking, and preheating various materials and test pieces. It adopts a hot air circulation method for uniform heating distribution and is suitable for aerospace, electronics and electrical engineering, instrumentation, automotive, semiconductor, photovoltaic, communication, plastic products, medical and other fields. In order to analyze and evaluate the performance and behavior of the product after experimental storage under the specified environmental conditions.
Feature
1. The exterior is made of SECC steel plate and treated with fine powder paint, while the interior is made of SUS stainless steel.
2. Circulation method: Forced horizontal air supply circulation.
3. New high-temperature resistant long axis motor.
(Appearance Reference Image. The actual product shall be the final standard.)
- Technical Parameters
| Item No. |
Parameter Name |
Technical parameters |
| 1.1 |
Equipment Name |
Button-Type High-Temperature Test Chamber |
| 1.2 |
Equipment Introduction |
This series of products is suitable for new energy, aerospace products, information electronic instruments and meters, materials, electrical engineering (products/components), automotive (products), metals, electronic products, various electronic components, and other fields. It is used to inspect their various performance indicators under high-temperature environments and for quality management purposes. |
| 1.3 |
Equipment Model |
BS-225G |
| 1.4 |
Effective Volume |
225L |
| 1.5 |
Internal Chamber Dimensions |
600*750*500 (W*H*D)(mm) |
| 1.6 |
External Dimensions |
850*1200*850(W*H*D) (mm) |
| 1.7 |
Temperature Range |
RT+10ºC→260ºC |
| 1.8 |
Heating Rate |
RT+10ºC→260ºC ≥3ºC/min (Full-process Non-linearity & No-load Acceptance) |
| 1.9 |
Temperature Display Accuracy |
Temperature:0.1ºC |
| 1.10 |
Temperature Deviation |
Temperature:±2ºC |
| 1.11 |
Temperature Fluctuation |
Temperature:≤±0.5ºC |
| 1.12 |
Temperature Uniformity |
Temperature:≤2.5ºC |
| 1.13 |
Weight |
240KG |
| 1.14 |
Power |
380V/5KW |
| 1.15 |
Others |
All the above performance indicators refer to the data measured under the conditions of no load, no test sample, and ambient temperature of 25±2ºC. Operating Noise:70dB (measured at 1 meter from the chamber door and 1.5 meters in height). |
- Compliant Test Standards
| Item No. |
Standards |
Explanation of Standards |
| 2.1 |
General standards |
GB-T2423.3-2006(IEC6008-2-78-2001) Test Cab: Constant Test Method |
GB-150.3A-2009 High-Temperature Test Method |
GBT 2423.2-2008 Environmental Testing for Electrical and Electronic Products - Part 2: Tests - Test B: High Temperature |
| 2.2 |
Acceptance Execution Standards |
Manufacturing Standards:GB/T10586-2006,GB/T10592-2008 |
| Verification Standards :GB/T5170.2-2017,GB/T5170.5-2016 |
| Technical Standards: Acceptance shall be conducted in accordance with the signed technical index requirements |
- Equipment Structure
| Item No. |
Description |
Technical Specification Parameters |
| 3.1 |
Cabinet Structure |
It features an integrated frame structure, welded with national standard channel steel, ensuring the equipment is robust and durable, with low vibration and low noise during operation. Meanwhile, it guarantees the overall reliability and safety performance of the equipment. |
| 3.2 |
Inner Chamber Material |
It adopts 1.0mm-thick SUS #304 stainless steel. The entire inner chamber is fully welded to ensure its sealing performance, with a reinforced bottom design that supports an average load of ≥300KG. |
| 3.3 |
Outer Shell Material |
It adopts cold-rolled steel plates with a thickness of 1.2mm, featuring double-sided spraying treatment and a blue-white color(Customizable according to customer requirements, color samples or color codes are available upon request). |
| 3.4 |
Thermal Insulation Material |
The thickness of the insulation layer is 100 mm, and the insulation medium is glass fiber cotton. |
| 3.5 |
Cabinet Door Structure |
It adopts a single-door design. A double-layer silicone rubber sealing strip is used between the door and the cabinet, which is resistant to high and low temperatures and aging, ensuring sealing performance. This design allows test personnel to open the door freely at the lock and hinge positions. |
| 3.6 |
Air Duct Components |
It adopts a circulating fan with a motor, an aluminum extended shaft, and a high/low temperature-resistant aluminum alloy multi-blade circulating fan, achieving forced convection vertical diffusion circulation. The air outlet is adjustable. |
| 3.7 |
Sample Shelf |
It is made of stainless steel, equipped with 2 sets of brackets, and can be freely adjusted up and down (customizable according to customer requirements). |
| 3.8 |
Test Port |
One test port with a diameter of 50mm is reserved on the left side of the chamber, and one set of silicone plug + sealing cover is provided. |
| 3.9 |
Three-Color Indicator Light |
Green for normal operation, yellow for standby, and red for fault alarm. |
| 3.10 |
Balance Hole |
A pressure balance hole is installed inside the chamber to balance the pressure between the inside and outside of the chamber. |
| 3.11 |
Swivel Caster |
Swivel casters are installed at the bottom of the equipment, facilitating the relocation, movement and positioning of the equipment. |
- Circulation System
| Item No. |
Description |
Technical Specification Parameters |
| 4.1 |
Air Supply Method |
It adopts a forced internal circulation mode with top air supply and bottom air return. The air deflector at the air outlet can disperse cold and hot air to the entire interior of the chamber, ensuring uniform and stable distribution. |
 |
| 4.2 |
Circulation Motor |
It is a long-shaft motor, installed outside the chamber, avoiding the influence of temperature and humidity inside the chamber. The long shaft extends directly into the interior of the chamber, with silicone insulation and sealing. |
 |
| 4.3 |
Centrifugal Impeller |
It is a multi-blade centrifugal circulating aluminum wind wheel, featuring light weight, large air volume, and high air pressure. Additionally, it exhibits resistance to high and low temperatures, a small expansion coefficient, and low operating noise. |
 |
| 4.4 |
Circulating Air Duct |
The circulating air duct is matched with the refrigeration and heating system, and the sealing plate is closely attached to the evaporator and heating tube, allowing the circulating air to fully absorb the cold energy from the evaporator and the heat energy from the heating tube. |
 |
| 4.5 |
Sensor |
Class A Platinum Resistance PT100+T Temperature and Humidity Sensor, featuring stable operation and accurate detection. |
- Heating System
| Item No. |
Description |
Technical Specification Parameters |
| 5.1 |
Heating Method |
It adopts an imported SSR (Solid-State Relay) for driving, featuring contactless control, no noise, no electric arc, and stable reliability. |
| 5.2 |
Heating Tube |
It adopts a stainless steel finned nickel-chromium wire high-speed heater. |
| 5.3 |
Heating System and Electrical Components |
It is a completely independent system that does not affect the refrigeration and humidification systems. Temperature control is achieved through microcomputer calculation and PID automatic adjustment; the output power changes based on the comparison result between the actual temperature value and the set temperature value, so as to achieve high precision, high efficiency, and high stability. Major low-voltage electrical components all adopt products from well-known brands: "Schneider" AC contactors and thermal overload relays, "OMRON" small intermediate relays, and Delixi signal lamps, switches, and circuit breakers. |
 |
- Control System
| Item No. |
Description |
Technical Specification Parameters |
| 6.1 |
Control Method |
Display Control + P.I.D Calculus Time + SSR Module for Heating Output Control |
| 6.2 |
Screen Display |
LCD Display Button-Type Controller: It can display the set temperature and current temperature, equipped with P.I.D auto-tuning control, includes four groups of temperature alarm output, supports internal four-stage nonlinear temperature deviation calibration, and provides DC 0~24V output control.
|
| 6.3 |
Temperature setting |
Adjust according to the device's temperature operating range (upper limit +5ºC, lower limit -5ºC) |
| 6.4 |
Timing Mode |
Temperature Deviation Timing |
| 6.5 |
Timer |
It supports switchable time units: seconds, minutes, 10-minute increments, hours, and 10-hour increments. The maximum timing range is 9999 × 10 hours. |
| 6.6 |
Running Mode |
Constant Operation |
| 6.7 |
Display Accuracy |
0.1ºC |
| 6.8 |
Login Method |
Chinese/English Name Login |
| 6.9 |
Deviation Calibration |
It prevents parameter deviations caused by various factors; after calibration, the temperature and humidity values can be more accurate and meet standards. |
| 6.10 |
Others |
Fault Alarm with Cause & Troubleshooting Prompt Function, Power Failure Protection Function, Upper/Lower Temperature Limit Protection Function, Timing Function (Auto-Start & Auto-Stop Operation), Self-Diagnosis Function |
- Safety Protection Device
| Item No. |
Technical Specification Parameters |
| 7.1 |
Adjustable Over-Temperature Protection |
| 7.2 |
Air Conditioning Duct Extreme Over-Temperature |
| 7.3 |
Overload and Short-Circuit Protection |
- List of Main Accessories
| Item No. |
Accessory Names |
Specifications / Model |
Brand |
| 8.1 |
Temperature Controller |
Digital display |
Made in China |
| 8.2 |
Outer Casing of the Test Chamber |
Cold-Rolled Steel Plate with Baking Paint Finish |
|
| 8.3 |
Chamber |
Stainless Steel Welding |
|
| 8.4 |
Power Circuit Breaker |
AW32AAG |
Schneider(France) |
| 8.5 |
Over-Temperature Protector |
0~399ºC |
Schneider(France) |
| 8.6 |
AC Contactor |
CU11 |
TAIAN(Taiwan) |
| 8.7 |
Solid-State Relay |
SSR-40A |
YANGMING(Taiwan) |
| 8.8 |
Heater |
5KW |
|
| 8.9 |
Circulation Fan Motor |
60W with Long Shaft |
|
| 8.10 |
Test Material Rack |
Stainless Steel Welding |
|
| 8.11 |
Wind Wheel |
5"× 2.5" |
|
| 8.12 |
Insulation Cotton |
Glass Fiber |
|
| 8.13 |
Alarm |
TS2BIL |
TIANDE(Taiwan) |
| 8.14 |
Circuit Breaker |
MB6C/1-5A |
ZHEGNTAI |
| 8.15 |
Sensor |
PT100 |
SONGYANG(Taiwan) |
- Installation and Operating Conditions for Test Equipment
| Key Point |
Specific Requirements |
| Space Requirements: Positioning & Handling, Installation Footprint Dimensions, and Placement Environment Requirements |
10.1 Installation Access It shall be able to pass through according to the external dimensions of the test chamber, with special attention to specific links such as corners, door entry dimensions, and elevator dimensions. For installation sites on upper floors or in underground vacant spaces, the floor load-bearing requirement of the site shall be ≥ 500kg/m². |
| 10.2 Floor Space and Peripheral Relevant Dimensions |
 |
| Space around the equipment shall comply with the following: A: ≥ 60cm; B≥ 60cm; C≥ 80cm; D≥ 80cm |
| The floor shall be level, with good ventilation, and free from flammable, explosive, corrosive gases and dust. |
| 10.3 Other Environmental Requirements for Test Chamber Operation |
Environmental Temperature Requirements |
5~28ºC Ensure Optimal Performance |
| Humidity Requirements |
≤85%R.H |
| Air Pressure Requirements |
86KPa~106KPa |
| Electromagnetic Environment |
There shall be no strong vibration or strong electromagnetic radiation sources around the equipment. |
| Site Drainage |
A drainage floor drain shall be provided within 2 meters of the test chamber. |
| 10.4 Safe Storage Conditions for Test Chambers |
When the test chamber is not in use, the storage environment of the test chamber shall be maintained at a temperature consistently above 0ºC. |
| If the storage environment temperature is below 0ºC, for water-cooled test chambers and humidity chambers, all residual water in the equipment shall be drained completely in a timely manner to prevent pipe damage caused by freezing. |
| Power and Related Conditions |
| 10.5 Grounding Requirements |
The grounding resistance shall be less than 4Ω, with independent grounding (i.e., TN-S grounding system), and a three-phase five-wire AC power supply shall be adopted (it is strictly prohibited to mix the neutral wire and ground wire). |
- Services
| Item No. |
Description |
Service Content |
| 12.1 |
Equipment Warranty Period |
The supplier shall provide a 1-year warranty for the test equipment starting from the date of acceptance. During the warranty period, fees such as material fees and repair fees shall be waived (excluding damages caused by human factors or natural disasters). The supplier commits to providing lifelong free technical support and conducting equipment operation consultation and inspection twice a year. |
| 12.2 |
Service Response Time |
Upon receiving the customer's maintenance request notification, the supplier shall respond within 2 hours and arrive at the customer's site within 24 hours, making every effort to repair the product promptly. The company has sufficient spare parts to provide timely, fast, and high-quality services. |
| 12.3 |
After-Sales Team |
The company has a dedicated After-Sales Service Department, with more than 5 after-sales service engineers. Meanwhile, it has set up office-based service stations and built a comprehensive customer service system, as well as established customer files. In addition to providing technical consultation services to customers, the company is also responsible for collecting and organizing customer complaints and consultation information. It ensures that the problems and requirements raised by customers are handled in a timely manner, and tracks and verifies the handling status while establishing corresponding records. These efforts provide a basis for improving quality and enhancing products. |
| 12.4 |
List of Randomly Included Documents |
One copy each of the Product User Manual, Instrument Operation Manual, Product Certificate of Conformity, and Product Warranty Card. |
| 12.6 |
Installation, Commissioning and Training |
After the equipment arrives at the buyer's factory, our party shall be responsible for the on-site installation, commissioning and trial operation of the equipment. Meanwhile, our party shall provide free training to the buyer's staff to ensure that the buyer's relevant personnel can independently complete all tests specified in the contract, perform equipment maintenance and troubleshoot basic faults. |
| 12.7 |
Installation, Commissioning and Acceptance |
The buyer shall be responsible for providing the external conditions required for equipment installation in accordance with the supplier's requirements, and the installation shall be conducted by our company. The supplier shall be responsible for on-site installation and commissioning at the buyer's location. After the completion of installation and commissioning, personnel from both the supplier and the buyer shall sign the commissioning and acceptance report to confirm approval. |


FAQ:
1.Are your company a trading one or a factory ?
Factory + trade (integration), 18 years focusing on test instruments field, 6 years exporting experience.
OEM is also acceptable for us.
2.How to choose the most suitable products?
Our team will give you the best suggestion as long as you tell us what kind of test you need to do and the required specification.
3.What's the delivery term?
At most of time, we have stock in the factory. If there is no stock, normally, the delivery time is 15-20 working days after deposit receipt. If you are in urgent need, we can consider making special arrangement for you.
4.Do you accept customization service?
Yes, of course, we can not only offer standard machines, but also customized machines according to your request. Don't hesitate to tell us your requirement, we will try our best to meet your needs.
5.Can we visit your factory before order?
Yes, we warmly welcome and sincerely invite you or your team to visit our factory, we will help to arrange hotel and pick up you from airport.