Environmental Corrosion Salt Fog Tester Chamber Salt Spray Testing Machine

Still deciding? Get samples of $ !
Order Sample
Product Details
Customization: Available
After-sales Service: Yes
Power Supply: 110-220V
Shipping
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Guarantee
Payment Methods:
T/T PayPal ApplePay GooglePay visa mastercard american express discover
JCB diners club PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Secured Trading Service
Diamond Member Since 2021

Suppliers with verified business licenses

Audited Supplier Audited Supplier

Audited by an independent third-party inspection agency

Address
Room 1113, No. 3236 Jiangshan Road, Lingang District, Pudong New Area, Shanghai, China
  • Environmental Corrosion Salt Fog Tester Chamber Salt Spray Testing Machine
  • Environmental Corrosion Salt Fog Tester Chamber Salt Spray Testing Machine
  • Environmental Corrosion Salt Fog Tester Chamber Salt Spray Testing Machine
  • Environmental Corrosion Salt Fog Tester Chamber Salt Spray Testing Machine
  • Environmental Corrosion Salt Fog Tester Chamber Salt Spray Testing Machine
  • Environmental Corrosion Salt Fog Tester Chamber Salt Spray Testing Machine
Find Similar Products

Basic Info.

Model NO.
BS-480B
Certification
CE
Warranty
1 Year
Model
BS-480b
Laboratory Volume
480L
Controller
Digital / Touch Screen Optional
Temperature Set
35±1 °(Cass)50±1
Spray Type
Continuous / Periodic Spraying
Types
Digital Control / Touch-Screen
Power
220V 3kw
Brine Tank Volume
32L
Saturated Air Tank
47℃±1℃
Test Chamber
50℃±1℃
Temperature Display Precision
Temperature: 0.1℃
Transport Package
Strong Wooden Box
Specification
1200*500*800(W*H*D)mm
Trademark
BAOSHI
Origin
Suzhou Jiangsu
HS Code
9027899090
Production Capacity
5000 Unit/Per Year

Packaging & Delivery

Package Size
125.00cm * 120.00cm * 145.00cm
Package Gross Weight
210.000kg

Product Description

                        Environmental Salt spray testing machine / Corrosion  Salt fog tester  chamber


                                                    Button-Type Salt Spray
Chamber

                                                                                         Product Design Specification (PDS)
Purpose
The salt spray testing machine is designed for surface treatment of various materials, including coatings, electroplating, anodizing, spraying, rust proof oil and other anti-corrosion treatments, to test the corrosion resistance of their products.
Salt spray test
 
 
Environmental Corrosion Salt Fog Tester Chamber Salt Spray Testing Machine
(Appearance Reference Image. The actual product shall be the final standard.)

 
  1. Technical Parameters
Item No. Parameter Name Technical parameters
1.1 Equipment Name Button-Type Salt Spray Chamber
1.2 Equipment Introduction It adopts salt spray corrosion method to test the corrosion resistance reliability of the tested samples. Salt spray refers to a dispersion system composed of tiny salt-containing droplets in the atmosphere, which is one of the artificial environment three-proof series. Many enterprise products need to simulate the destructive effects of the climate around the ocean on products, so the salt spray test chamber comes into being. Salt spray tests are divided into neutral salt spray and acid salt spray, which differ in the applicable standards and test methods, known as "NSS" test and "CASS" test respectively. They are the most common test methods in artificial three-proof climates.
1.3 Equipment Model BS-480B
1.4 Effective Volume 480L
1.5 Internal Chamber Dimensions 800×1200×500(W*H*D)(mm)
1.6 External Dimensions 1150×1700×1200(W*H*D)(mm)
1.7 Brine Tank Volume 32L
1.8 Test Temperature Neutral Salt Spray Test:
  1. Test Chamber: 35ºC±1ºC
  2. Saturated Air Tank: 47ºC±1ºC
Acid Corrosion Test:
  1. Test Chamber: 50ºC±1ºC
  2. Saturated Air Tank: 63ºC±1ºC
It can also be set according to standards such as JIS and CNS
1.9 Applicable Test Methods Neutral Salt Spray Test (NSS Test),
Acetic Acid Salt Spray Test (ASS Test),
Copper Accelerated Acetic Acid Salt Spray Test (CASS Test)
1.10 Temperature Display Precision Temperature: 0.1ºC
1.11 Temperature Deviation Temperature: ±2ºC
1.12 Temperature Fluctuation Temperature: ≤±0.5ºC
1.13 Temperature Uniformity Temperature: ≤2.5%ºC
1.14 Spray Rate (ml/80cm²/h) 1.0~2.0 (Collected for at least 16 hours, take the average value)
1.15 Spray Pressure 1.00±0.01kgf/cm²
1.16 Operation Time 1S ~ 9990H, arbitrarily settable
1.17 Spray Time 1S ~ 999H, arbitrarily settable; Interval Cycle: 1S ~ 999H, arbitrarily settable
1.18 Weight 180KG
1.19 Power 220V 3KW
1.20 Others
  1. The above performance indicators are data measured under the conditions of no load, no test samples, and ambient temperature of 25±2ºC.
  2. 70dB (1 meter away from the chamber door, 1.5 meters high).
  1. Compliant Test Standards
Item No. Standards Explanation of Standards
2.1 General standards GB/T2423.17-2008 Test Methods for Salt Spray
GB/T 2423.18-2000 Basic Procedures for Electrical and Electronic Products Test Ka
 GB/T10125-1997 Corrosion Tests in Artificial Atmospheres - Salt Spray Tests
GB/T10587-2006 Technical Conditions for Salt Spray Test Chambers
GB10593.2-1990 Methods for Measuring Environmental Parameters of Electrical and Electronic Products
GB/T1771-2007 Determination of Neutral Salt Spray Resistance of Paints and Varnishes
GJB150.11A-2009 Salt Spray Test for Military Equipment Laboratories
 
2.2 Acceptance Execution Standards Manufacturing Standards: GB/T10586-2006, GB/T10592-2008
Verification Standards: GB/T5170.2-2017, GB/T5170.5-2016
Technical Standards: Acceptance according to the signed technical index requirements
  1. Equipment Structure
Item No. Description Technical Specification Parameters
3.1 Cabinet Structure Both the inner and outer chambers of the machine are made of high-temperature, high-humidity, and high-corrosion resistant PP boards, welded by advanced endless belt three-dimensional reinforcement technology. The structure is solid, non-deformable, and elegant in appearance, suitable for various test specifications such as salt water spray and copper acetate tests.
3.2 Inner Chamber Material 8mm thick PP board; overall full welding treatment to ensure the sealing performance of the inner chamber; bottom reinforcement design, bearing capacity ≥100KG average load.
3.3 Outer Shell Material 8mm thick PP board
3.4 Thermal Insulation Material Thermal insulation layer thickness is 80MM, insulation medium is glass fiber cotton.
3.5 Test Chamber Cover Roof-type 110-degree perspective cover, allowing clear observation of the test conditions inside the chamber.
3.6 Isolation Water Tank Seals the chamber cover with water to avoid salt spray leakage.
3.7 Saturated Air Tank Located at the bottom of the control box, made of SUS#304 stainless steel plate, functioning as filtration, heating, and humidification. It purifies the air to reach saturated temperature and humidity before spraying through the nozzle. The saturator has an automatic water replenishment function.
3.8 Measuring Cylinder Collects the spray volume of each test, with a maximum scale of 50ml each time.
3.9 Pressure Regulating Valve Manually adjusts the intake pressure and spray pressure. Intake pressure is controlled at 0.3mPa; spray pressure is controlled at 0.07-0.17mPa. (The above pressures have been adjusted before leaving the factory, and generally, users do not need to adjust them again)
3.10 Pressure Gauge The pressure displayed by the pressure gauge pointer is the pressure when the air from the saturated air tank is delivered to the nozzle for spraying.
3.11 Water Replenishment System
  1. Water replenishment for test chamber and pressure tank: Manual
  2. Chemical solution replenishment: Adopts a built-in hidden large water tank, manual water replenishment method
3.12 Mist Discharge Pipe 50mm diameter PVC hard plastic pipe, which releases the pressure caused by spraying when the salt spray test chamber is working, and the excess water in the chamber also overflows through this pipe.
3.13 Collector The fine mist sprayed by the nozzle settles in a free-fall manner, with one or more built-in surface areas.
3.14 Heating Water Tank Attached to the bottom of the test chamber, used to hold water and heat to maintain a stable temperature in the test chamber.
3.15 Shelf Made of plastic steel, single-bar bearing capacity not exceeding 2kg; can bear weight within 10kg if placed dispersedly. Two layers, one-time molding with standard molds, can meet the inclined test of about 15 degrees ~ 30 degrees(Ensure that the experimental solution does not deposit).
3.16 Nozzle Made of tempered glass, the spray volume and spray angle can be adjusted. Precision crystal glass nozzle (PYREX) without crystal blockage.
3.17 Electrical Control Cabinet The circuit control board and other components are fixed in positions convenient for inspection and maintenance, adopting a door-lock opening side cover door, which is not only beautiful but also convenient for maintenance.
3.18 Control Panel Touch screen control: Water shortage indicator, over-temperature indicator, end indicator, spray indicator, defogging indicator, test chamber temperature controller, pressure tank temperature controller, pressure gauge, main power switch, operation switch, timing switch, spray switch, defogging switch.
  1. Spray System
Item No. Description Technical Specification Parameters
4.1 Spray Device Adopts a tower-type spray tower with functions of guiding mist, adjusting mist volume, and uniform fog falling, while effectively expanding the internal space of the test chamber.
4.2 Spray Gas Treatment The spray gas undergoes two-stage voltage stabilization and pressure regulation, with oil pollution filtration and gas humidification and preheating simultaneously.
4.3 Atomization Treatment The atomized salt water is stored in a built-in hidden type with a large storage capacity.
4.4 Pressure Control Through intake pressure regulating valve, spray pressure regulating valve, and pressure gauge. Air pressure is adjusted in two stages: 1Kg/cm². The first stage is rough adjustment: 2Kg/cm², adopting imported air filter with drainage function. The second stage is precision adjustment: 1Kg/cm², 1/4 pressure gauge, displaying precisely and accurately.
4.5 Spray Volume Increasing the conical disperser on the spray tower increases the spray volume; decreasing it reduces the spray volume.
  1. Heating System
Item No. Description  Technical Specification Parameters
5.1 Heating Method Adopts steam heating method, with fast heating speed and reduced standby time. When the temperature is reached, it automatically switches to constant temperature state, with precise temperature and low power consumption. Titanium alloy heating tube, acid and alkali corrosion resistant, with ultra-long service life.
5.2 Heating Tube Adopts stainless steel finned nickel-chromium wire high-speed heater.
5.3 Heating System Temperature control is realized by microcomputer calculation and PID automatic adjustment. The output power changes according to the comparison result between the actual temperature and the set temperature, so as to achieve high precision, high efficiency, and high stability.
  1. Control System
Item No. Description Technical Specification Parameters
6.1 Control Method Digital display control + P.I.D calculus time + SSR module control heating output
6.2 Screen Display Key-type controller, can display set temperature and current temperature, with P.I.D automatic calculation control, including four groups of temperature alarm point outputs, internal four-stage nonlinear temperature deviation calibration, DC 0~24V output control
6.3 Set Temperature Adjust according to the temperature working range of the equipment (upper limit +5ºC, lower limit -5ºC)
6.4 Timer Can switch between seconds, minutes, 10 minutes, hours, and 10 hours, maximum timing 9999 × 10 hours
6.5 Operation Mode Constant operation
6.6 Display Precision 0.1ºC
6.7 Login Method Name login
6.8 Auxiliary Functions Fault alarm and cause, processing prompt function, power failure protection function, upper and lower limit temperature protection function, timing function (automatic start and automatic stop operation).
  1. Safety Protection Devices
Item No. Technical Specification Parameters
7.1 When the water level is low, automatically cut off the power supply, and the safety warning light device displays dynamically.
7.2 When over-temperature occurs, automatically cut off the heater power supply, and the safety warning light device displays dynamically.
7.3 Leakage protection function to prevent personal injury and instrument failure caused by line leakage or short circuit.
7.4 Heating system protection function: dry burning of heating tube, abnormal water supply, abnormal drainage
  1. Main Accessories List
Item No. Description Technical Specification Parameters Brand Quantity
8.1 Temperature Controller Domestic high-quality Domestic high-quality 1 set
8.2 Pressure Tank Temperature Controller Domestic high-quality Domestic high-quality 1 set
8.3 Chemical Solution Temperature Controller Domestic high-quality Domestic high-quality 1 set
8.4 Spray Tower Plastic processing Baoshi Self-made 1 set
8.5 Nozzle Custom glass Baoshi Self-made 1 piece
8.6 Chamber Shell PP board welding Baoshi Self-made 1 set
8.7 Chamber Inner Tank PP board welding Baoshi Self-made 1 set
8.8 Chemical Solution Tank PP board welding Baoshi Self-made 1 set
8.9 Temperature Limiter BS-110SB ZHEGNTAI 2 pieces
8.10 Test Chamber Heating Tube 1.2KW Baoshi Self-made 1 piece
8.11 Pressure Tank Heating Tube 450W Baoshi Self-made 1 piece
8.12 Solid State Relay SSR-40A Taiwan Yangming 3 sets
8.13 Intermediate Relay 2NJ ZHEGNTAI 3 pieces
8.14 Timer AH5R ZHEGNTAI 1 set
8.15 Water Supply/Spray Solenoid Valve SD2002-02DN DKC 4 pieces
8.16 Pressure Regulating Valve AR1000-02 Dongchen 2 pieces
  1. List of Main Accessories
Item No. Accessory Name Quantity Unit
9.1 V-type/O-type Shelf 1 Set
9.2 Custom Sample Bearing Frame 1 Set
9.3 Measuring Cylinder 2 Pieces
9.4 Collector 2 Pieces
9.5 Glass Nozzle 1 Piece
9.6 Salt Water Filter 2 Pieces
9.7 Spray Tower 2 Sets
9.8 Test Chemical Sodium Chloride 2 Bottles
9.9 Plastic Rust-proof Bucket 1 Piece
  1. Installation and Operating Conditions for Test Equipment
Key Point Specific Requirements
Space Requirements: Positioning & Handling, Installation Footprint Dimensions, and Placement Environment Requirements
10.1 Installation Access
It shall be able to pass through according to the external dimensions of the test chamber, with special attention to specific links such as corners, door entry dimensions, and elevator dimensions. For installation sites on upper floors or in underground vacant spaces, the floor load-bearing requirement of the site shall be ≥ 500kg/m².
10.2 Floor Space and Peripheral Relevant Dimensions Environmental Corrosion Salt Fog Tester Chamber Salt Spray Testing Machine
Space around the equipment shall comply with the following: A: ≥ 60cm; B≥ 60cm; C≥ 80cm; D≥ 80cm
The floor shall be level, with good ventilation, and free from flammable, explosive, corrosive gases and dust.
10.3 Other Environmental Requirements for Test Chamber Operation Environmental Temperature Requirements 5~28ºC Ensure Optimal Performance
Humidity Requirements ≤85%R.H
Air Pressure Requirements 86KPa~106KPa
Electromagnetic Environment There shall be no strong vibration or strong electromagnetic radiation sources around the equipment.
Site Drainage A drainage floor drain shall be provided within 2 meters of the test chamber.
10.4 Safe Storage Conditions for Test Chambers When the test chamber is not in use, the storage environment of the test chamber shall be maintained at a temperature consistently above 0ºC.
If the storage environment temperature is below 0ºC, for water-cooled test chambers and humidity chambers, all residual water in the equipment shall be drained completely in a timely manner to prevent pipe damage caused by freezing.
Power and Related Conditions
10.5 Grounding Requirements The grounding resistance shall be less than 4Ω, with independent grounding (i.e., TN-S grounding system), and a three-phase five-wire AC power supply shall be adopted (it is strictly prohibited to mix the neutral wire and ground wire).
  1. Services
Item No. Description Service Content
11.1 Equipment Warranty Period The supplier shall provide a 1-year warranty for the test equipment starting from the date of acceptance. During the warranty period, fees such as material fees and repair fees shall be waived (excluding damages caused by human factors or natural disasters).
The supplier commits to providing lifelong free technical support and conducting equipment operation consultation and inspection twice a year.
11.2 Service Response Time Upon receiving the customer's maintenance request notification, the supplier shall respond within 2 hours and arrive at the customer's site within 24 hours, making every effort to repair the product promptly. The company has sufficient spare parts to provide timely, fast, and high-quality services.
11.3 After-Sales Team The company has a dedicated After-Sales Service Department, with more than 5 after-sales service engineers. Meanwhile, it has set up office-based service stations and built a comprehensive customer service system, as well as established customer files. In addition to providing technical consultation services to customers, the company is also responsible for collecting and organizing customer complaints and consultation information. It ensures that the problems and requirements raised by customers are handled in a timely manner, and tracks and verifies the handling status while establishing corresponding records. These efforts provide a basis for improving quality and enhancing products.
11.4 List of Randomly Included Documents One copy each of the Product User Manual, Instrument Operation Manual, Product Certificate of Conformity, and Product Warranty Card.
11.6 Installation, Commissioning and Acceptance The buyer shall be responsible for providing the external conditions required for equipment installation in accordance with the supplier's requirements, and the installation shall be conducted by our company. The supplier shall be responsible for on-site installation and commissioning at the buyer's location. After the completion of installation and commissioning, personnel from both the supplier and the buyer shall sign the commissioning and acceptance report to confirm approval.

Environmental Corrosion Salt Fog Tester Chamber Salt Spray Testing MachineEnvironmental Corrosion Salt Fog Tester Chamber Salt Spray Testing MachineEnvironmental Corrosion Salt Fog Tester Chamber Salt Spray Testing MachineEnvironmental Corrosion Salt Fog Tester Chamber Salt Spray Testing Machine
FAQ:

1.Are your company a trading one or a factory ?

Factory + trade (integration), 18 years focusing on test instruments field, 6 years exporting experience.
OEM is also acceptable for us. Welcome to check factory !

2.How to choose the most suitable products?
Our team will give you the best suggestion as long as you tell us what kind of test you need to do and the required specification.

3.What's the delivery term?
At most of time, we have stock in the factory. If there is no stock, normally, the delivery time is 15-20 working days after deposit receipt. If you are in urgent need, we can consider making special arrangement for you.

4.Do you accept customization service?
Yes, of course, we can not only offer standard machines, but also customized machines according to your request. Don't hesitate to tell us your requirement, we will try our best to meet your needs.

5.Can we visit your factory before order?
Yes, we warmly welcome and sincerely invite you or your team to visit our factory, we will help to arrange hotel and pick up you from airport.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Send Inquiry
Chat Now